Cheezious restaurant kitchen installation by Ambassador
Case studyCheezious

Cheezious restaurant kitchen

Branded fast-casual concept: optimised hot-line and prep zoning, grease-rated ventilation, cold chain beside the cookline, and a handover tuned for franchise consistency.

Client
Cheezious
Location
Pakistan
Sector
Fast-casual restaurant
Completed
2024

At a glance

Quantified outcomes from this engagement

500+

peak-hour covers (design basis)

100%

Drawings signed before fab

Turnkey

Survey → install → commission

Handover & training completed

Overview

Executive summary

We partnered on the back-of-house for a high-volume casual dining brand where ticket time and repetitive layout across sites matter as much as equipment spec. Scope included cookline zoning (griddle, fryers, conveyor oven interface), fabricated stainless benches and risers, exhaust duty matched to branded equipment, and commissioning with kitchen leads before soft launch.

Scope & deliverables

What we delivered

  • Site survey & as-built verification in live trading window
  • 2D CAD layout + equipment schedule aligned with franchisor standards
  • 3D visualization for ops sign-off
  • Custom stainless — counters, shelving, splashbacks
  • Hood & duct fabrication; make-up air coordination
  • Install, balance, snagging, and operator training

Challenge & response

How we aligned engineering with real-site constraints

Challenge

Tight shell dimensions and existing MEP stubs that could not move without programme risk — plus the need to protect dine-in ambience with controlled noise and odour paths.

Our response

We re-sequenced the cookline in CAD, reduced horizontal duct runs where possible, specified inverter-friendly exhaust, and staged installs after hours so trading impact stayed minimal.

Visual evidence

2D documentation, 3D visualization, and site photography — the same journey your project will follow.

2D

2D layout & working drawings

Plans, elevations, and equipment schedules used for approval and fabrication.

3D

3D design visualization

Spatial clarity for stakeholders before stainless and MEP go to site.

Installed

Installed kitchen — as built

Commissioned equipment, stainless, hoods, and ergonomics in daily service.

Ready for a kitchen that matches your operation?

Share your menu, footprint, and timeline — we translate it into surveyed drawings, 3D approvals, fabricated stainless, and a commissioned handover like the projects above.